NigeriaGas turbine fuel gas pretreatment

Natural gas pretreatment & pressure regulating station for a gas turbine power plant, Nigeria — 420,000 Nm³/h

Fuel gas conditioning for a power plant with ten GE 9E heavy-duty gas turbines — impurity removal and pressure stabilisation at 420,000 Nm³/h.

Get a Quote

Natural gas pretreatment station pipework at a construction site

Operating conditions

LocationNigeria
Flow rate420,000 Nm³/h
ApplicationPower plant GE gas turbines (10 units × 9E)
Inlet pressure5 MPa
Outlet pressure1.9–3.1 MPa
SolutionNatural gas pre-treatment station
Project typeTurnkey equipment supply

Scope of supply

  • Multi-stage filtration and separation of solids and condensate
  • Multi-stage pressure regulation from 5 MPa to 1.9–3.1 MPa under load variation
  • Balanced gas distribution to the 10 turbines
  • Slam shut valves, pressure relief devices and monitoring
  • Skid-mounted modular design

Project notes

Gas turbines are sensitive to contamination in the fuel supply: dust, water and pipeline impurities can damage fuel nozzles and reduce combustion efficiency, so the station filters first and regulates second.

Tell us your gas, flow and pressure.

We come back with a configuration and quotation basis for your conditions.